Here in these photos you're able to see the scaffolding positioned, in this case, at the north wall so that each corner in its turn could receive the careful interior and exterior carpentry work required. On the last day the south side scaffolding travelled from west to east while the castellations were delicately figured along the roofline. The left photo is the final day's saunter back to the mini-house to prepare for the trip back to Oxford Mills and the end of this part of the work. The next leg of the journey for Andre and Rock would be the ferry crossing and the Loyalist highway to Kingston and Highway 15.
This off the grid net zero home is designed by Robert Beckett, an Ontario architect while this blog is written by Robert and his wife, Linda Girard. This netzero home features a slab on grade construction, massive concrete block walls and hollow core slab second floor and large solar windows to contain the sun's warmth. It is the plan for a couple committed to low energy consumption in an aesthetically graceful environment.
Monday, November 15, 2010
Close to the Final Leg of the Roofline
Here in these photos you're able to see the scaffolding positioned, in this case, at the north wall so that each corner in its turn could receive the careful interior and exterior carpentry work required. On the last day the south side scaffolding travelled from west to east while the castellations were delicately figured along the roofline. The left photo is the final day's saunter back to the mini-house to prepare for the trip back to Oxford Mills and the end of this part of the work. The next leg of the journey for Andre and Rock would be the ferry crossing and the Loyalist highway to Kingston and Highway 15.
Truss Tales
Living with the construction crew on a day-to-day basis was close-up and personal in the mini-house (i.e. a cozy one bedroom home with a futon and some floor space). I think that now it's time that you get acquainted with them too.
Thursday, November 4, 2010
Truss Positioning is Delicate; the Results Dramatic!
Once the carpenters had had their Thanksgiving weekend, their turkey well tucked into their tummies, they returned to the construction site to make good on their promise to finish the roof 'before the weather runs out', as the eastern Ontario expression goes. They began with the double trusses of the studio roof positioning the main girder exactly as needed across from north to south. Once the main girder was in place, the diagonal girders were positioned into each of the north and south corners. Finally the large hangers were tacked in place.
Friday, October 22, 2010
The Alexandrian Approach
The architect today speaks of the process of building the net zero home and his influences that form this 21st century farmhouse. One of his most important influences is the architectural theorist, Christopher Alexander.
The architect says of Christopher that...
"He is a highly original thinker in architecture, one of the few to do comprehensive research into vernacular forms worldwide. His later works are an attempt to describe a more complete theory of aesthetics. He is also a construction technology researcher and very much a social justice architect. One of my early influences was his seminal book, A Pattern Language first published in 1977, where he speaks of our shared universal aesthetics environment around us as it is measured in patterns. See a new website: www.patternlanguage.com
The goal of this design is to achieve a very low energy consuming home. At this same time, we want a home that is comfortable, durable and enjoyable. In this regard, the patterns from A Pattern Language by Christopher Alexander are useful but only go so far. A twentieth century passive solar net zero energy farmhouse is a new phenomenon not found in vernacular history. So I must employ ingenuity and creativity in giving form to the concept."
Oct. 22, 2010. Kemptville, On.“Another Alexandrian idea is that of developing the design during construction: first responding to the building site relationship then approaching technical issues in a fluid way. A first example of this process was the casting in of insulation into the foundation thereby eliminating a later procedure of glueing the insulation in place. Secondly, att this current point of construction I am using the engineering geometry of the roof truss layout to generate the drainage patterns of the roof. The solution was to erect low stub walls in specific areas to create the needed slopes. Third, the engineering layout suggested an interesting articulation at the corners of the high roof. A quick consult with the carpentry crew and the change was made on site adding interest and delight to the roof silhouette.
Through the experience of working with the construction process and continuous design refinement, the crew is achieving more than we could have under the traditional working drawing approach.” Oct. 22, 2010. Kemptville, On.
Monday, October 18, 2010
Sunset at Headwater
There will be many more like these, but the Architect's wife felt it was the right time when the truss crew brought me out to the porch of the mini-house to witness another glorious sunset.
Let's Introduce the Truss Team
Here on a sunny day in October, Bob (the Architect & General Contractor) invites you to meet the truss team. He is practicing something that typically architects are not know to often do i.e. work alongside the tradesmen moving the project forward. In the next entry, you'll hear from Bob as he touches on this 'Alexandrian' approach as defined by his mentor, Christopher Alexander. From left to right: Mile, Rock, Andre and Steen. This carpenters' team is putting in place the roof structure including the carport.
Friday, October 15, 2010
First Day with Full Crew
A dependable and honest tradesman is a treasure to keep a lifetime and the architect has his carpenter that he has known for a decade. While he speaks of his skills with a hammer he is also a musician and a trained luthier (a designer and builder of wood stringed instruments). We approached Andre and he offered to provide a working crew for this roofing job and that they could arrange travel from Oxford Mills to the County after Thanksgiving weekend. The additional men were Rock and his son, Steen.